• Effective
    17/11/2024 - 31/12/2025

We're making some improvements to our bus network in November.

Check the drop-down boxes below for more information on the services that are changing, complete with downloadable timetables.

Revised route: Trips will terminate at the new Porthcawl Metrolink instead of John Street, although John Street will still be served by the Porthcawl bound journey, on route to the Porthcawl Metrolink. Return trips toward Bridgend will operate via the Esplanade and Porthcawl Library before resuming the current route via Fenton Place.

Revised timetable: Amended timetable to improve punctuality and reduce wait times at certain bus stops.

You can view the service 63 timetable that First Cymru will be operating from 18 November 2024 by clicking here.

Revised timetable: The first trip towards Swansea will commence from Margam Village at 07:06 instead of the current start point at Twelve Knights.

You can view the service X1 timetable that First Cymru will be operating from 17 November 2024 by clicking here.

Revised route: Trips will terminate at the new Porthcawl Metrolink instead of John Street. Return trips towards Bridgend and Cardiff will operate via the Esplanade, Porthcawl Library and Lias Road. John Street will no longer be served by the X2, customers are instead advised to use the service 63. The last two trips (Mon-Sat) will terminate at Lias Road as the Metrolink will be closed at this time.

Revised timetable: Amended timetable to improve punctuality and reduce wait times at certain bus stops.

You can view the service X2 timetable that First Cymru will be operating from 18 November 2024 by clicking here.

Share this