Share this

Service 65 | Albion Street, Morley | Resurfacing Works

23/02 – 27/02 | 09:30 – 15:00

Towards Gildersome: Normal Route.

Towards City: From Morley timing point, Wellington Street, Queensway, Corporation Street, Fountain Street, resuming route.

We apologise for any inconvenience caused.

The public charging network isn’t designed for large vehicles

As the number of electric buses entering service grew, Calibre D2D Ltd found itself grappling with a major logistical challenge. The UK’s public charging network was designed for cars and vans, not for vehicles the size of a double-decker, and there was no dedicated national network built around the needs of commercial operators.

Share this

Church Lane Crossgates open early today , Service 56 is returning to normal route


Service 56 | Church Lane | Resurfacing Works

16/02 – 27/02 | 09:30 – 15:00 (Monday to Friday Only)

Towards City: From Eastwood Lane, Barwick Road, Pendas Way, Manston Lane, follow to resume route.

Towards Whinmoor: From Austhorpe Road, Pendas Way, Barwick Road, Eastwood Lane resuming route.

Share this

Service 95 | Walkley Bole Hill

Due to roadworks, we are unable to use the terminus, services to divert via Walkley Road, Walkley Lane and Forbes Road to Hillsborough Interchange running back to South Road via Ripley Street and Walkley Road.

We apologise for any inconvenience caused.

Share this

The following services are experiencing unexpected disruption on 26/01/2026 >>


X30

Temporary traffic lights have been installed on London Road (outside The Travellers Joy). Heavy traffic in and around the area.

The X30 is experiencing delays of up to 30 minutes.

Opco
Share this

Service 25, 26, 26A | Canary Way

The left turn from Koblenz Avenue onto Canary Way is blocked due to road closed signs. To ensure service remains to both Riverside and the Rail Station, services will be split.

Service 25 will be terminating and starting at the Rail Station, with no service to Riverside. 

Share this

Service X11

Due to an electrical problem the service 08:55 from Belton will not run. We will try and resume the service as soon as possible.


Service 8 

Due to not having enough buses for service, the following will not run this afternoon: 

Share this

UPDATE - 12:00 Friday 20th February.

We have just been made aware that the flood gates have been closed again on the Somerset Levels between Burrowbridge and East Lyng and service 374 will with regret be unable to serve between Street and Taunton until further notice.

Therefore we will be unable serve any bus stops between and including the Pedwell Hill Bottom in Pedwell and Taunton Bus Station in either direction. 

Service 374 from Pedwell will be diverted to Bridgwater Bus Station where you can board the service 21 from Bay 4 to Taunton.

Share this

Service 267, 263 | Killermont Street West Bound

Share this

Service 72, X6 A647 Leeds Road

Due to Yorkshire Water repairs including 3-way temporary signals on the A647 Leeds Road J/O Marsland Place, delays to affect service 72, X6 throughout the day.

We apologise for any inconvenience caused.

Subscribe to